Your Web News in One Place

Help Webnuz

Referal links:

Sign up for GreenGeeks web hosting
March 5, 2020 04:46 pm GMT

New way of building bridges could be faster, cheaper, better

You've probably seen this triangle before: Fast, Cheap, Good -- Pick Two. Here's a new bridge-building technique from Austria that seems to allow the customer to get a bridge that's faster, cheaper, better than traditional bridges.

From Popular Mechanics:

The umbrella method is a completely new way to construct a static final bridge. This TU Wien team first worked on the idea in 2006, and its been experimenting and fine tuning since then. Instead of traditional kinds of bridge buildingi.e. putting up long-term scaffolding as rebar is laid and concrete is filled into structuresthis mechanism is built like a closed umbrella and then unfolded into its final position. From there, its hollow girders are filled with concrete and the rest of the structural elements are completed.

Erecting bridges using scaffolding usually takes months, designer Johann Kollegger said in a statement. The elements for the balanced lowering method, on the other hand, can be set up in two to three days, and the lowering process takes around three hours. But this process, he says, is less invasive for bridges through protected or uneven terrain. The team's sample bridge over the Lafnitz River touches a nature preserve.

Image: YouTube Read the rest


Original Link: https://boingboing.net/2020/03/05/new-way-of-building-bridges-co.html

Share this article:    Share on Facebook
View Full Article