Your Web News in One Place

Help Webnuz

Referal links:

Sign up for GreenGeeks web hosting
May 16, 2011 11:05 pm

Tunnel Boring Machine Completes Hole Under Niagara Falls

abhatt writes with news that "Big Becky," a 4,000-ton tunnel boring machine, has finished chewing through over 10 kilometers of rock underneath Niagara Falls, Ontario, a project that's been underway since 2006."The 10.2 kilometer tunnel is 14.4 meters in diameter. Big Becky ate through 1.6 million cubic meters of rock to reach her goal. That’s enough rock, officials said, to fill the Rogers Centre in Toronto. And the cement used to line the tunnel would build a sidewalk stretching from Windsor to Quebec City. ... The project took longer and cost more because Becky ran into unexpected conditions. She’s designed to go through solid rock, but encountered a stretch of loose, crumbling material that was unsuitable for tunneling. That forced a long and expensive detour."

Read more of this story at Slashdot.



Original Link: http://rss.slashdot.org/~r/Slashdot/slashdot/~3/lLj5LD8xve8/Tunnel-Boring-Machine-Completes-Hole-Under-Niagara-Falls

Share this article:    Share on Facebook
View Full Article

Slashdot

Slashdot was originally created in September of 1997 by Rob "CmdrTaco" Malda. Today it is owned by Geeknet, Inc..

More About this Source Visit Slashdot